We develop community-scale onshore wind and energy storage projects to serve local demand.
We are a UK-based renewable energy developer delivering community-scale assets that support a resilient, decentralised power system. We specialise in the origination and development of small-scale battery storage and renewable projects tailored to local network and demand needs.
Learn more.
Our Strategy
01
We develop sub-5 MW, distribution-connected assets designed to avoid transmission constraints and long grid timelines. By focusing on 11 kV, 6.6 kV and LV-adjacent connections, export-limited designs, and DNO-aligned engineering, we deliver projects that connect faster and with lower development risk.
Distribution-First Development
02
Community-Scale,
not Mega-Scale
We prioritise re-use of existing sites - industrial land, substations, and legacy energy infrastructure -to minimise planning risk and land competition. This enables faster consenting and supports credible community benefit and local energy solutions.
03
Unlocking Value from Existing Infrastructure
We specialise in repowering and augmenting existing energy infrastructure—legacy onshore wind, constrained grid connections, and underutilised sites—by integrating longer-duration storage and grid-support capability. This maximises the use of existing assets and connections, unlocking additional system value while minimising land take and avoiding unnecessary greenfield development.
-
Location: Cambridgeshire
Technology: Wind
Capacity: 1MW
Connection Date: 2026 -
Location: Strathaven
Technology: Wind
Capacity: 2.5MW
Connection Date: 2027 -
Location: East Renfrewshire
Technology: Wind
Capacity: 4MW
Connection Date: 2027 -
Location: West Lothain
Technology: Wind
Capacity: 8.4MW
Connection Date: 2026 -
Location: Greater London
Technology: BESS
Capacity: 5MW
Connection Date: 2028
Our Projects
-
Location: Lancashire
Technology: BESS
Capacity: 4.9MW
Connection Date: 2028 -
Location: Berkshire
Technology: BESS
Capacity: 5MW
Connection Date: 2028 -
Location: Cambridgeshire
Technology: BESS
Capacity: 5MW
Connection Date: 2028 -
Location: Kent
Technology: BESS
Capacity: 5MW
Connection Date: 2028