We develop community-scale onshore wind and energy storage projects to serve local demand.

We are a UK-based renewable energy developer delivering community-scale assets that support a resilient, decentralised power system. We specialise in the origination and development of small-scale battery storage and renewable projects tailored to local network and demand needs.

Learn more.

Our Strategy

01

We develop sub-5 MW, distribution-connected assets designed to avoid transmission constraints and long grid timelines. By focusing on 11 kV, 6.6 kV and LV-adjacent connections, export-limited designs, and DNO-aligned engineering, we deliver projects that connect faster and with lower development risk.

Distribution-First Development

02

Community-Scale,
not Mega-Scale

We prioritise re-use of existing sites - industrial land, substations, and legacy energy infrastructure -to minimise planning risk and land competition. This enables faster consenting and supports credible community benefit and local energy solutions.

03

Unlocking Value from Existing Infrastructure

We specialise in repowering and augmenting existing energy infrastructure—legacy onshore wind, constrained grid connections, and underutilised sites—by integrating longer-duration storage and grid-support capability. This maximises the use of existing assets and connections, unlocking additional system value while minimising land take and avoiding unnecessary greenfield development.

  • Location: Cambridgeshire
    Technology: Wind
    Capacity: 1MW
    Connection Date: 2026

  • Location: Strathaven
    Technology: Wind
    Capacity: 2.5MW
    Connection Date: 2027

  • Location: East Renfrewshire
    Technology: Wind
    Capacity: 4MW
    Connection Date: 2027

  • Location: West Lothain
    Technology: Wind
    Capacity: 8.4MW
    Connection Date: 2026

  • Location: Greater London
    Technology: BESS
    Capacity: 5MW
    Connection Date: 2028

Our Projects

  • Location: Lancashire
    Technology: BESS
    Capacity: 4.9MW
    Connection Date: 2028

  • Location: Berkshire
    Technology: BESS
    Capacity: 5MW
    Connection Date: 2028

  • Location: Cambridgeshire
    Technology: BESS
    Capacity: 5MW
    Connection Date: 2028

  • Location: Kent
    Technology: BESS
    Capacity: 5MW
    Connection Date: 2028

Contact us